Customization: | Available |
---|---|
After-sales Service: | with |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The 60T/H stationary asphalt mixing plant is a reliable partner in road construction and maintenance. With a high production capacity of 60 tons per hour, it ensures rapid progress on large-scale projects. Utilizing advanced mixing technology and precise batching systems, it produces high-quality, uniform asphalt mixtures. Its sturdy and durable design guarantees long-term stable operation.
What's more, we offer customizable color options to meet clients' personalized aesthetic demands for roads. Whether classic black asphalt or color asphalt that blends into the urban landscape, we can easily achieve it. This feature makes our product suitable not only for highways and urban roads but also for park paths and scenic routes where both beauty and practicality are valued.
Choose 60T/H stationary asphalt mixing plant for an efficient, stable, and aesthetic road construction
Description | Item | Quantity |
Cold Aggregate Supply System | Four storage bins,;capacity 8m3/each Unload size:2600W*2300H |
4 |
Variable speed discharge belt size: B500*3400mm Each capacity: 2.8~60 Tons Per Hour Grading bucket motor power 1.5 KW |
4 | |
Aggregate collecting belt B650mm Max capacity: 60 Tons Per Hour Vibrator of sand bin motor power 0.25KW |
1 | |
Special design & characteristic: 1)aggregate hopper will be equipped with removable net to protect the motor; 2)Cold hopper will be sprayed with anti-rust paint; 3)Aggregate feeder will stick safety notice to protect operators. |
||
Oversize screen, aggregate size ≥40mm will be taken out | 1 | |
Inclined feeding belt conveyor B650*16000mm; Max capacity: 60 Tons Per Hour Power:4kw |
1 | |
Drying Drum | Drying drum dimensions: Φ1200X5200mm; Max capacity 60 Tons Per Hour |
1 |
Friction driving motor 1*11kw |
1 | |
50mm thermal isolation rock wool, stainless steel surface |
1 | |
Temperature sensor with infrared thermometer | 1 | |
Special design & characteristic: 1)Outside the drum is 50mm rock wool , covering with stainless steel; two layers design will increase the production; 2)Anti-rust paint will be sprayed inside the dryer 3)Dryer will stick safety notice to protect operators. |
||
Combustion system | Diesel and heavy diesel oil burner; Mechanical atomization, rated fuel oil 450kg/h |
1 |
Diesel oil tank | 1 | |
Equipped with automatic flame failure protection devices for emergency | 1 | |
Fuel pump power 3kw | 1 | |
Heater power 4.5kw | ||
15kw Blowing fan power 15kw | 1 | |
Dust Removal System | Gravity dust collector(first grade) + bag house dust collectors(second grade) | |
A set of gravity dust collector | 1 | |
A set of bag house filtering system | 1 | |
Dust emissions: ≤20mg/Nm³ | ||
Filtering area: 256m2 | ||
NOMEX bag: 256pcs(USD DuPont famous brand) | 256 | |
Filler recycling screw conveyer | 2 | |
Power:3kw | ||
Filler discharging screw conveyer | 1 | |
Power:4kw Size:Ф219mm | ||
Fan Power: 30kw | 1 | |
A set of cooling wind system | 1 | |
Filler Supply System | Filler bin volume: 30m3;filler temporary storage bin volume 1*1.5 m3 | 1 |
Filler screw conveyer, capacity≥ 10 Tons Per Hour,Power:1*4kw | 1 | |
Filler elevator, chains type, capacity≥ 20 Tons Per Hour,Power:1*4kw | 1 | |
Bitumen Supply System (diesel oil direct-heating type) |
Bitumen tank 30t | 1 |
directly heated bitumen tank,volume 30 m3 | 1 | |
oil discharge tank volume 1*2 m3 | 1 | |
Bitumen circulation pump 5.5kw | 1 | |
Bitumen discharge pump 7.5 kw | 1 | |
All bitumen pipe | 1 | |
Bitumen pumps, heat valves, pipes | 1 | |
Elevator system | Hot Aggregate Lifter 5.5kw | 1 |
Plate chain bucket elevator | ||
Anti-reversal reducer | ||
Mixing Tower | Vibration screen, 4 layer Capacity≥ 60 Tons Per Hour |
4 |
Motor power 2.35kw | 2 | |
Hot aggregate storage bin volume 10m³ | 1 | |
Hot aggregate metering bin:700kg | 1 | |
Sensors*3 | ||
Powder metering bin: 100kg/ batch | 1 | |
Sensors*3 | ||
Filler Vibrating Motor 0.12kw | ||
Filler metering and conveying motor 3kw | ||
Asphalt bin: 100kg/ batch | 1 | |
Sensors*3 | ||
Bitumen spraying pump 7.5KW | 1 | |
Twin shaft mixer capacity:700kg/batch | ||
Motor 1* 30kw | ||
Mixing time 18s, cycle time 45s, motor power 1* 30kw | ||
driving height 3.7 m hot aggregate bin 4 pcs steel structure, support feet, ladder and platform. |
1 | |
Pneumatic System | Air compressor, 2.3m³/min,1*15kw | 1 |
Pipe line, valve, pneumatic components. | 1 | |
Air storage tank: 1000L | 1 | |
Control System | Electrical motor control system | 1 |
breaker+ short-circuit protection +overload protection + contactor | ||
Aggregate temperature control system | 1 | |
Infrared thermometer, computer auto control | ||
Burner control system | 1 | |
PLC control system, auto start/firing, safety monitoring, automatic fault protection | ||
Weighing control system | 1 | |
PLC control, color display, auto weighing, auto error compensation, formula input, printing output | ||
Mixing control system | 1 | |
PLC control, manual/auto operation, formula input | ||
Control room: 4000*2200*2500mm | ||
Additional supply | Accessories | 1 |
Working tools | 1 |
Q1:Erection/commissioning/training
A:1) The buyer should prepare the earthwork, electrical power supply etc based on the seller's technical drawings, and prepare professional worker- team, include: electrical workers, welding workers, maintenance workers, operators, also necessary working tools as truck crane etc.
2) The seller will send 2 persons to guiding erection in the buyer's working site, and training operators for the buyer.
3) The buyer will bear accommodation, go and return air tickets, local transportation fees, medical care; and allowance USD150/day for each person, and assist the seller's to get the Visa.
4) General erection time is about 30-35 working days.
Q2:What payment options do you accept?
A:We accept both Telegraphic Transfer(T/T) and Letter of Credit (LC),providing you with flexibility and convenience.
Q3: What kind of after-sales services do you offer?
A:Our after-sales services are second to none,as we offer technical support and provide spare parts to ensure the long lifespan of our products.
Q4: How do you deliver spare parts?
A:You can rely on us to deliver the spare parts you need through trusted shipping methods such as DHL,UPS,orFedEx.
Q5: What shipping options do you provide?
A:Shipping your order is hassle-free with ourvarious options.We use container,flat rack container, Roll-on/Roll-off (Roro) vessel,and bulk vessel for shipping,ensuring yourproducts are delivered safely and efficiently.
Q6: What is the delivery time for your products?
A:Delivery time ranges from 7 to 60 days after receiving the deposit,giving you a clearidea of when to expect yourorder. Rest assured,we strive to deliver your products in a timely manner.
At Beijing Tourfine Import and Export Co. Ltd, we fully appreciate that each customer comes with distinct needs and preferences. We are wholeheartedly committed to accommodating any bespoke requirements you may have. Share your specifications with us, and we will custom-manufacture trailers and trucks that perfectly align with your vision and operational demands.
When it comes to spare parts, we steadfastly offer only the finest quality options. You can rest assured that our spare parts will exceed your expectations, ensuring your trailers and trucks remain in peak condition, delivering reliable and smooth performance consistently.