We proudly introduce this high-performance 120t/h asphalt mixing plant, specially designed for road construction. Incorporating advanced production technology and rigorous quality control, it ensures efficient and stable production capacity. With a processing volume of 120 tons per hour, it significantly boosts construction efficiency and shortens project timelines, making it ideal for large-scale road construction projects.
The asphalt mixing plant features an intelligent control system for easy operation and precise control of asphalt, aggregate, and additive proportions, ensuring high-quality mixtures. Its compact structure minimizes footprint and facilitates transportation and installation. Additionally, we offer comprehensive after-sales services, including equipment installation and debugging, operational training, and regular maintenance, to ensure your equipment remains in optimal condition.
Whether you're seeking solutions to enhance construction efficiency or ensure project quality, this 120t/h asphalt mixing plant meets your needs. Inquire now for purchase and let's build better roads together.
Description | Item | Quantity |
Cold Aggregate Supply System | Four storage bins,;capacity 8m3/each Unload size:3200W*2800H |
4 |
Variable speed discharge belt size: B500mm Each capacity: 120 Tons Per Hour Grading bucket motor power 1.5 KW |
4 | |
Aggregate collecting belt B650mm Max capacity: 120 Tons Per Hour Motor 4kw Vibrator of sand bin motor power 0.25kw |
1 | |
Special design & characteristic: 1)aggregate hopper will be equipped with removable net to protect the motor; 2)Cold hopper will be sprayed with anti-rust paint; 3)Aggregate feeder will stick safety notice to protect operators. |
||
Oversize screen, aggregate size ≥40mm will be taken out | 1 | |
Inclined feeding belt conveyor B650mm; Max capacity: 120 Tons Per Hour Power:4kw |
1 | |
Drying Drum | Drying drum dimensions: Φ1800X7870mm; Max capacity 120 Tons Per Hour |
|
Friction driving motor 4*11kw |
||
50mm thermal isolation rock wool, stainless steel surface |
||
Temperature sensor with infrared thermometer | 1 | |
Special design & characteristic: 1)Outside the drum is 50mm rock wool , covering with stainless steel; two layers design will increase the production; 2)Anti-rust paint will be sprayed inside the dryer 3)Dryer outside will be stick with safety notice to protect operators. |
||
Combustion system | Diesel oil burner; Mechanical atomization, rated fuel oil 1000kg/h |
1 |
Diesel oil tank | 1 | |
Equipped with automatic flame failure protection devices for emergency | 1 | |
Fuel pump power 5.5kw | 1 | |
Heater power 9kw | ||
Air Compressor Power:15kw Exhaust:2.3m³/min |
1 | |
Blowing fan power 15kw | 1 | |
Dust Removal System | Gravity dust collector(first grade) + bag house dust collectors(second grade) | |
A set of gravity dust collector | 1 | |
A set of bag house filtering system | 1 | |
Dust emissions: ≤20mg/Nm³ | ||
Filtering area: 448m2 | ||
NOMEX bag: 448pcs(USD DuPont famous brand) | 448 | |
Filler recycling screw conveyer | 2 | |
Power:3kw | ||
Filler discharging screw conveyer | 1 | |
Power:4kw Size:Ф219mm | ||
Fan Power: 75kw | 1 | |
A set of cooling wind system | 1 | |
Filler Supply System | Filler bin volume: 30m3 filler temporary storage bin volume 1*1.8m3 |
1 |
Filler screw conveyer, capacity≥ 20 Tons Per Hour,Power:1*4kw | 1 | |
Filler elevator, chains type, capacity≥ 20 Tons Per Hour,Power:1*4kw | 1 | |
Bitumen Supply System (diesel oil direct-heating type) |
Bitumen tank 30t | 2 |
directly heated bitumen tank,volume 30 m3 | ||
400000 kcal fuel thermal oil system hot pump power: 2*5.5kw filling pump: 1*1.5kw |
1 | |
Bitumen discharge tank volume 1*2 m3 | 1 | |
Bitumen circulation pump 5.5kw | 1 | |
Bitumen discharge pump 7.5 kw | 1 | |
All bitumen pipe | 1 | |
Bitumen pumps, heat valves, pipes | 1 | |
Elevator system | Hot Aggregate Lifter 11kw | 1 |
Plate chain bucket elevator | ||
Anti-reversal reducer | ||
Mixing Tower | Vibration screen, 4 layer Capacity≥ 120 Tons Per Hour |
4 |
Vibration screen power 2.35kw | 2 | |
Hot aggregate storage bin volume 18m³ | 1 | |
Hot aggregate metering bin:1500kg | 1 | |
Sensors*3 | ||
Powder metering bin: 200kg/ batch | 1 | |
Sensors*3 | ||
Filler Vibrating Motor 0.12kw | ||
Filler metering and conveying motor 3kw | ||
Asphalt bin: 150kg/ batch | 1 | |
Sensors*3 | ||
Bitumen spraying pump 11KW | 1 | |
Twin shaft mixer capacity:1500kg/batch | ||
Motor 2*30kw | ||
Mixing time 18s, cycle time 45s, motor power 2*30kw | ||
driving height 3.7 m hot aggregate bin 4 pcs steel structure, support feet, ladder and platform. |
1 | |
Pneumatic System | Air compressor, 3.6m³/min,22kw | 1 |
Pipe line, valve, pneumatic components. | 1 | |
Air storage tank: 1000L | 1 | |
Control System | Electrical motor control system | 1 |
breaker+ short-circuit protection +overload protection + contactor | ||
Aggregate temperature control system | 1 | |
Infrared thermometer, computer auto control | ||
Burner control system | 1 | |
PLC control system, auto start/firing, safety monitoring, automatic fault protection | ||
Weighing control system | 1 | |
PLC control, color display, auto weighing, auto error compensation, formula input, printing output | ||
Mixing control system | 1 | |
PLC control, manual/auto operation, formula input | ||
Control room: 4500*2200*2500mm | ||
Additional supply | Accessories | 1 |
Working tools | 1 |
Q1:Erection/commissioning/training
A:1) The buyer should prepare the earthwork, electrical power supply etc based on the seller's technical drawings, and prepare professional worker- team, include: electrical workers, welding workers, maintenance workers, operators, also necessary working tools as truck crane etc.
2) The seller will send 2 persons to guiding erection in the buyer's working site, and training operators for the buyer.
3) The buyer will bear accommodation, go and return air tickets, local transportation fees, medical care; and allowance USD150/day for each person, and assist the seller's to get the Visa.
4) General erection time is about 30-35 working days.
Q2:What payment options do you accept?
A:We accept both Telegraphic Transfer(T/T) and Letter of Credit (LC),providing you with flexibility and convenience.
Q3: What kind of after-sales services do you offer?
A:Our after-sales services are second to none,as we offer technical support and provide spare parts to ensure the long lifespan of our products.
Q4: How do you deliver spare parts?
A:You can rely on us to deliver the spare parts you need through trusted shipping methods such as DHL,UPS,orFedEx.
Q5: What shipping options do you provide?
A:Shipping your order is hassle-free with ourvarious options.We use container,flat rack container, Roll-on/Roll-off (Roro) vessel,and bulk vessel for shipping,ensuring yourproducts are delivered safely and efficiently.
Q6: What is the delivery time for your products?
A:Delivery time ranges from 7 to 60 days after receiving the deposit,giving you a clearidea of when to expect yourorder. Rest assured,we strive to deliver your products in a timely manner.
At Beijing Tourfine Import and Export Co. Ltd, we understand that every customer has unique requirements. That's why we are more than happy to accommodate any special requirements you may have. Simply let us know, and we will manufacture trailers and trucks tailored to your needs.
When it comes to spare parts, we only provide high-quality options. You can trust that our spare parts will meet your expectations and keep your trailers and trucks running smoothly.