Customization: | Available |
---|---|
After-sales Service: | with |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Tourfine proudly introduces its premier offering: the Customizable 160 Ton Mobile Mixer, an engineering marvel crafted for the rigorous demands of expansive road construction ventures. Celebrated for its outstanding performance, impressive productivity, and adaptable operation, this mixing plant is a testament to innovative excellence in the marketplace.
Harnessing cutting-edge intermittent mixing technology, this plant guarantees the consistency and superior quality of asphalt mixtures. Its vast 160-ton capacity is a game-changer, significantly boosting productivity to seamlessly address the needs of monumental projects like highways and urban thoroughfares. The ingenious mobile design empowers the plant to seamlessly navigate and adjust to diverse, intricate construction landscapes, markedly elevating construction efficiency.
Tourfine remains steadfast in its dedication to delivering unparalleled products and services. We employ only the finest materials and advanced manufacturing techniques to ensure the mixing plant's steadfast stability and remarkable durability. Our commitment extends beyond delivery, offering professional technical support and comprehensive after-sales service to provide timely and effective assistance.
For those seeking an asphalt mixing plant that epitomizes efficiency, stability, and reliability, while enhancing construction efficiency and quality, look no further than the Tourfine 160-ton mobile intermittent asphalt mixing plant-your optimal selection.
Item | Components | Specification | Quantity |
Cold Aggregate Feeding System | Aggregate hopper | Capacity: 8m3 Load Width:3.2m Loading height: 4.1m |
5 |
Variable speed discharge belt | Width:B500mm | 1 | |
Power: 2.2kw Capacity: 160t/h |
5 | ||
Frequency converter | 5 | ||
Inclined belt conveyor | Belt Width:650mm Max. capacity: 160 t/h power: 5.5kw |
1 | |
Vibrator on hopper wall | Power: 0.25kW | 2 | |
Trailer frame | L17000xW2450xH4300mm | Single axle frame, 4 tires, Tire model 8.25R16 |
|
Drying Drum | Drum drum | Diameter:1940mm Length:9400mm Max capacity: 160 Tons/h |
1 |
Rock wool insulation layer | Thickness: 50mm | 1 | |
Friction driving reduction gears with motor | Power: 18.5kw | 4 | |
Temperature sensor | With infrared thermometer | 1 | |
Trailer frame | L12000xW2450xH4500mm | Single axle frame, 4 tires, Tire model 8.25R16 |
|
Combustion System | Diesel or heavy oil burner/mechanical atomization | Rate fuel oil:1250kg/h | 1 |
Automatic flame failure protection devices | 1 | ||
Fuel pump | Power: 7.5 kw | 1 | |
Air compressor | Power: 15kW Exhaust:2.3m³/min |
||
Diesel oil tank | 1 | ||
Air blower | Power: 37kw | 1 | |
Aggregate Elevator | Hot aggregate elevator, chains type | Power:11kw capacity: ≥ 120 Tons Per Hou Equipped with auto stop device |
1 |
Dust Removal System | Gravity dust collector (level one) | 1 | |
Bag house dust catcher (secondary dust removal) |
Dust emissions: ≤20mg/Nm³ Filtering area: 750m2 |
1 | |
METAMAX bag | 720 | ||
Screw Conveyor (Under Volute casing collector) | Motor power: 4kW | 1 | |
Screw Conveyor (Under bag house collector) | Motor power: 5.5W | 1 | |
Screw Conveyor (Dust discharge) | Power:4kw | ||
Induced draft fan | Power: 110kW | 1 | |
Cold wind system | 1 | ||
Trailer frame | L9000xW2450xH4300mm | Single axle frame, 4 tires, Tire model 8.25R16 |
|
Filler Supply System | Filler bin | Capacity:30m³ | 1 |
Level indicator | 2 | ||
Temporary filler storage bin | Capacity: 0.7m3 | 1 | |
Filler elevator | Power: 4kw | 1 | |
Filler conveying Screw (from filler bin to elevator ) | power: 4kw | 1 | |
Filler metering Screw (from temporary storage bin to metering bin) | power: 4kw | 1 | |
Bitumen Supply System(Direct heating type Bitumen tank) | Bitumen tank | Capacity: 40m³ Thermal oil heating type |
2 |
Thermal oil heating system | 400,000kcal | 1 | |
Diesel oil burner for heating Thermal oil | Power:18.5kW | ||
Pump for bitumen circulation | Power: 7.5kW | 1 | |
Pump for bitumen unload | Power: 7.5kW | 1 | |
Bitumen unload tank | 2m3 | 1 | |
Mixing Tower | Vibrating screen | 5 screen layers Capacity: ≥ 120 Tons Per Hour Motor power: 2*2.9KW |
1 |
Hot aggregate elevator | Chains type Motor power: 15kW |
||
Hot aggregate weighing bin | Volume: 2000kg | ||
Sensors | 3 | ||
Filler weighing hopper | Volume: 300kg | 1 | |
Sensors | 3 | ||
Bitumen weighing bin | Volume: 200kg | ||
Sensors | 3 | ||
Twin shaft paddle mixer | Capacity: 2000kg/batch Mixing time 15-25s; Power: 2*37kW |
1 | |
Bitumen spraying pump | Power:15kw | 1 | |
Trailer frame | L12000xW2500xH4500mm | Doubile axle frame, 8 tires, Tire model 8.25R16 |
|
Pneumatic System | Air compressor | Exhaust: 3.6m³/min power: 22kw |
1 |
Air storage | Volume:1000L | 1 | |
Control System | Fully auto electrical motor control system | ||
Aggregate temperature control system | |||
PLC burner control system | |||
PLC weighing control system | |||
PLC mixing control system | |||
Control room | Size:4000mm*2200mm*2500mm(Corrugated board) | ||
Control cabinet | 2 | ||
Operating platform | |||
Voltmeter | |||
Ammeter | |||
Printer | |||
Touch screen 5.7'' | |||
17″LED display | |||
Air conditioner | |||
Semi-trailer Serials | Track TR | 1840mm | 4 |
Pin roll diameter | 90mm | ||
Leaf spring | 90*13 standard | ||
Additional Supply | Accessories | set | 1 |
Working tools | set | 1 |
Q1:Erection/commissioning/training
A:1) The buyer should prepare the earthwork, electrical power supply etc based on the seller's technical drawings, and prepare professional worker- team, include: electrical workers, welding workers, maintenance workers, operators, also necessary working tools as truck crane etc.
2) The seller will send 2 persons to guiding erection in the buyer's working site, and training operators for the buyer.
3) The buyer will bear accommodation, go and return air tickets, local transportation fees, medical care; and allowance USD150/day for each person, and assist the seller's to get the Visa.
4) General erection time is about 30-35 working days.
Q2:What payment options do you accept?
A:We accept both Telegraphic Transfer(T/T) and Letter of Credit (LC),providing you with flexibility and convenience.
Q3: What kind of after-sales services do you offer?
A:Our after-sales services are second to none,as we offer technical support and provide spare parts to ensure the long lifespan of our products.
Q4: How do you deliver spare parts?
A:You can rely on us to deliver the spare parts you need through trusted shipping methods such as DHL,UPS,orFedEx.
Q5: What shipping options do you provide?
A:Shipping your order is hassle-free with ourvarious options.We use container,flat rack container, Roll-on/Roll-off (Roro) vessel,and bulk vessel for shipping,ensuring yourproducts are delivered safely and efficiently.
Q6: What is the delivery time for your products?
A:Delivery time ranges from 7 to 60 days after receiving the deposit,giving you a clearidea of when to expect yourorder. Rest assured,we strive to deliver your products in a timely manner.
At Beijing Tourfine Import and Export Co. Ltd, we recognize that each customer has distinct needs. That's why we enthusiastically accommodate special requests, ensuring that every trailer and truck we produce is tailored to your specifications.
Regarding spare parts, our unwavering commitment to quality guarantees that only top-tier options are provided, ensuring your trailers and trucks maintain peak performance.