Customization: | Available |
---|---|
After-sales Service: | with |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Embarking on a new era in road construction technology, the 2024 model 60t/h intermittent mandatory mobile asphalt mixing plant stands as a beacon of innovation and efficiency. With its state-of-the-art control system, it seamlessly automates and intellectualizes the production process, boosting both operational efficiency and the consistency of asphalt mixtures. Designed with a mighty production capacity of 60 tons, it is eminently suited to meet the fast-paced demands of expansive road projects, ensuring rapid and reliable delivery.
The mixing plant showcases an exclusive design with mandatory mixing capabilities, guaranteeing superior performance in every batch of asphalt. Its mobility offers exceptional flexibility, allowing swift relocation across various construction sites, thereby significantly cutting costs related to transportation and installation. Additionally, the plant's intermittent operation mode ensures outstanding stability and quality of the mixtures, underpinning robust support for your road construction endeavors.
Whether constructing highways, urban thoroughfares, or airport runways, the 2024 model 60t/h intermittent mandatory mobile asphalt mixing plant delivers unparalleled performance and operational efficiency, transforming road construction and elevating it to unparalleled levels of excellence.
Item | Components | Specification | Quantity |
Cold Aggregate Feeding System | Aggregate hopper | Capacity: 6.5m3 Width:3.2m Loading height: 3.6m |
4 |
Aggregate feeder | Belt Width:500mm | 1 | |
Power: 1.5kw Capacity: 60-70t/h |
4 | ||
Frequency converter | 1 | ||
Belt aggregate collecting conveyor | Belt Width:650mm Motor power: 4kW |
1 | |
Inclined belt conveyor | Belt Width:650mm Max. capacity: 60 Tons power: 4kw |
1 | |
Vibrator on hopper wall | Power: 0.25kW | 1 | |
Trailer frame | L17000xW2450xH4300mm | Single axle frame, 4 tires, Tire model 8.25R16 |
|
Drying Drum | Drum drier | Φ1.2m, Length:5.2m Max capacity: 60 Tons Per Hour |
1 |
Rock wool insulation layer | Thickness: 50mm | 1 | |
Motor on drying drum | Power: 11kw | 1 | |
Temperature sensor | 1 | ||
Trailer frame | L12000xW2450xH4500mm | Single axle frame, 4 tires, Tire model 8.25R16 |
|
Combustion System | Diesel or heavy oil burner/mechanical atomization | Rate fuel oil: 450kg/h |
1 |
Automatic flame failure protection devices | 1 | ||
Fuel pump protection | Power: 3 kw | 1 | |
Diesel tank | 1 | ||
Air blower | Power: 15kw | 1 | |
Hot Aggregate Elevator | Motor with speed reducer | Power:5.5kw Anti-Reverse |
1 |
Dust Removal System | Cyclone dust catcher(primary dust removal) | 1 | |
Bag house dust catcher (secondary dust removal) |
Dust emissions: ≤20mg/Nm³ Filtering area: 259m2 |
1 | |
METAMAX bag | 240 | ||
Screw conveyor (under cyclone dust catcher) | Motor power: 4kW | 1 | |
Screw conveyor (disposal) | Motor power: 4W | 1 | |
Induced draft fan | Power: 30kW | 1 | |
Temperature sensor | 1 | ||
Cold air valve | 1 | ||
Trailer frame | L9000xW2450xH4300mm | Single axle frame, 4 tires, Tire model 8.25R16 |
|
Filler Supply System | Level indicator | 2 | |
Temporary filler storage bin | Capacity: 0.7m3 | 1 | |
Filler elevator | Power: 4kw | 1 | |
Filler conveying Screw (from filler bin to elevator ) | power: 4kw | 1 | |
Filler metering Screw (from temporary storage bin to metering bin) | power: 4kw | 1 | |
Bitumen Supply System(Direct heating type Bitumen tank) | Bitumen tank | Capacity: 30m3 Direct heating |
1 |
1 set of asphalt pipe | 1 | ||
Pump for bitumen circulation | Power: 5.5kW | 1 | |
Pump for bitumen unload | Power: 7.5kW | 1 | |
Bitumen unload tank | 2m3 | 1 | |
Mixing Tower | Vibrating screen | 4 screen layers Motor power: 2*2.35KW |
1 |
Hot aggregate storage bin | 10m³ | 1 | |
Hot aggregate weighing bin | Volume: 700kg | ||
Sensors | 3 | ||
Bitumen weighing bin | Volume: 100kg | ||
Sensors | 3 | ||
Twin shaft paddle mixer | Capacity: 700kg/batch Mixing time 15~25s; Power: 30kW |
1 | |
Bitumen spraying pump | Power:7.5 kw | 1 | |
Trailer frame | L12000xW2500xH4500mm | Doubile axle frame, 8 tires, Tire model 8.25R16 |
|
Pneumatic System | Air compressor | Exhaust: 2.3Nm³/min power: 15kw |
1 |
Air cylinder;magnetic valve | 1 | ||
Control System | Electrical motor control system | ||
Aggregate temperature control system | |||
PLC burner control system | |||
PLC weighing control system | |||
PLC mixing control system | |||
Control room | Size:3000mm*2200mm*2500mm(Corrugated board) | ||
Control cabinet | |||
Operating platform | |||
Voltmeter | |||
Ammeter | |||
Printer | |||
Touch screen 5.7'' | |||
17″LED display | |||
Air conditioner | |||
Additional Supply | Accessories | set | 1 |
Working tools | set | 1 |
Q1:Erection/commissioning/training
A:1) The buyer should prepare the earthwork, electrical power supply etc based on the seller's technical drawings, and prepare professional worker- team, include: electrical workers, welding workers, maintenance workers, operators, also necessary working tools as truck crane etc.
2) The seller will send 2 persons to guiding erection in the buyer's working site, and training operators for the buyer.
3) The buyer will bear accommodation, go and return air tickets, local transportation fees, medical care; and allowance USD150/day for each person, and assist the seller's to get the Visa.
4) General erection time is about 30-35 working days.
Q2:What payment options do you accept?
A:We accept both Telegraphic Transfer(T/T) and Letter of Credit (LC),providing you with flexibility and convenience.
Q3: What kind of after-sales services do you offer?
A:Our after-sales services are second to none,as we offer technical support and provide spare parts to ensure the long lifespan of our products.
Q4: How do you deliver spare parts?
A:You can rely on us to deliver the spare parts you need through trusted shipping methods such as DHL,UPS,orFedEx.
Q5: What shipping options do you provide?
A:Shipping your order is hassle-free with ourvarious options.We use container,flat rack container, Roll-on/Roll-off (Roro) vessel,and bulk vessel for shipping,ensuring yourproducts are delivered safely and efficiently.
Q6: What is the delivery time for your products?
A:Delivery time ranges from 7 to 60 days after receiving the deposit,giving you a clearidea of when to expect yourorder. Rest assured,we strive to deliver your products in a timely manner.
At Beijing Tourfine Import and Export Co. Ltd, we recognize that each customer comes with distinct needs. Thus, we are dedicated to accommodating any special requirements you may have. Share your specific needs with us, and we will craft trailers and trucks that are perfectly tailored to your specifications.
Our commitment to quality extends to our spare parts, where only the finest options are presented. Rest assured, our premium spare parts will exceed your expectations, ensuring your trailers and trucks operate with flawless efficiency.